LIVE DATA · sourced from the web
★★★★★Under renovation

lebua at State Tower

Bangkok, Thailand

Built 2006 · Last completed renovation 2025

⟳ Phased renovation — hotel remains open · some areas may be affected

lebua at State Tower in Bangkok is currently under renovation, with completion expected 2026. Its last completed renovation on record was in 2025. HotelChrono Chrono Score: 9.7/10 (freshness pending).

HotelChronoSourced & VerifiedMedium confidenceLast verified: 17 Sept 2026How we verify →Report an error

Data check

  • · Phased renovation — hotel remains open; some areas may be affected

Confidence by dimension

Renovation under way: ConfirmedReopening date: EstimatedCompletion verified: Pending

Renovation forecast · estimate

Next renovation expected around 2033

In about 7 years (≈8-year cycle). A model estimate, not a sourced fact.

Renovation Radar →
lebua at State Tower, Bangkok

Photo via Wikimedia Commons

Location

Satellite view · Bangkok, Thailand

Timeline

  1. 2006

    Hotel opened

  2. 2025

    28 suites redesigned with earthy tones and sleek wood accents

  3. 2026

    Multi-phased renovation program including Tower Club Signature Collection, dinin

  4. 2026

    Additional culinary concepts and enhancements completion by end of 2026

How this score is computed

Chrono Score v1.1deterministic · reproducible · pure freshness, never mixed with stars
# sourced: last completed renovation in 2025
100 − 3.5 × 1 year = 97
= 9.7 / 10 · Fresh

Every figure here traces back to the sourced renovation year above — no hidden weighting, no black box. Recompute it yourself. See the full methodology →

What changed in the 2025 renovation

28 suites redesigned with earthy tones and sleek wood accents
“In late 2025, 28 suites underwent a redesign with earthy tones and sleek wood accents.”— source · retrieved 2026-09-17

Scope is quoted verbatim from the cited source — we never guess what a renovation covered.

Facts

Stars

5★

Built

Sourced

2006

Swimming pools

Sourced

1

Last completed renovation

Sourced

2025

Renovation in progress

announced/started 2026

Sources

Our iron rule: no quote, no data. Every date links back to the exact sentence it came from.

Secondary · renovation_started 2026weight 0.70 · retrieved 2026-09-17view source →

“Celebrating its 20th anniversary in 2026, lebua Bangkok is currently debuting a landmark renovation program that introduces newly redesigned suites, a revitalized wellness floor, and enhanced rooftop dining experiences.”

Secondary · renovation_announced 2026weight 0.70 · retrieved 2026-09-17view source →

“Several of these enhancements are already underway, with completion slated for the end of 2026.”

Weak source · Renovation 2025weight 0.50 · retrieved 2026-09-17view source →

“In late 2025, 28 suites underwent a redesign with earthy tones and sleek wood accents.”

Reference (Wikipedia) · Built 2006weight 0.65 · retrieved 2026-09-17view source →

“Opening: 2006”

Own or manage lebua at State Tower?

Add your renovation date

Open during a phased renovation.

Some areas may be affected by works — check current conditions before you book.

Check availability →

Booking links may be affiliate links.

For hoteliers

🏷️ Embed this Chrono Score on your site+

Hoteliers: show your independently verified freshness and link guests to your full timeline. Free — paste this where you want the badge.

Theme
Chrono Score badge preview
<a href="https://hotelchrono.com/hotel/lebua-at-state-tower-bangkok" target="_blank" rel="noopener">
  <img src="https://hotelchrono.com/api/badge/lebua-at-state-tower-bangkok.svg" alt="lebua at State Tower — Chrono Score, verified by HotelChrono" width="360" height="112">
</a>

More hotels in Bangkok

All hotels in Bangkok →

Frequently asked

When was lebua at State Tower built?+

lebua at State Tower (Bangkok, Thailand) was built in 2006.

How old is lebua at State Tower?+

lebua at State Tower is 20 years old — it was built in 2006 and last renovated in 2025. Age measures the building; the Chrono Score measures how fresh it feels today.

Is lebua at State Tower being renovated?+

lebua at State Tower is currently under renovation (expected completion 2026), but the hotel remains open during phased works. Until the works are completed and verified, we do not count it as a completed renovation; its last completed renovation was in 2025.

What is the Chrono Score of lebua at State Tower?+

Its Chrono Score is 9.7/10, but freshness is currently pending — lebua at State Tower is under renovation, so the score reflects its last completed state rather than the works in progress.

Explore hotels by renovation status